Koecklin, Manuel Tong and Longoria, Genaro and Fitiwi, Desta and DeCarolisc, Joseph and Curtis, John (2021) Public acceptance of new renewable electricity generation and transmission lines. ESRI Research Bulletin 202105 February 2021. UNSPECIFIED.
PDF - Published Version Download (454Kb) |
Abstract
The research shows that the electricity system can accommodate the public's preferences for new wind farms and transmission lines but are subject to higher costs. With a policy target of 70 per cent renewable generation and growing electricity demand, electricity prices could dramatically escalate if there is a sharp deterioration in the public's acceptance of new energy infrastructure.
Export/Citation: | EndNote | BibTeX | Dublin Core | ASCII (Chicago style) | HTML Citation | OpenURL |
Social Networking: |
Item Type: | Other |
---|---|
Subjects for non-EU documents: | EU policies and themes > Policies & related activities > energy policy (Including international arena) Countries > Ireland |
Subjects for EU documents: | UNSPECIFIED |
EU Series and Periodicals: | UNSPECIFIED |
EU Annual Reports: | UNSPECIFIED |
Series: | Series > Economic and Social Research Institute (ESRI), Dublin > ESRI Research Bulletin |
Depositing User: | Daniel Pennell |
Official EU Document: | No |
Language: | English |
Date Deposited: | 02 Aug 2021 09:54 |
Number of Pages: | 4 |
Last Modified: | 02 Aug 2021 09:54 |
URI: | http://aei.pitt.edu/id/eprint/103474 |
Actions (login required)
View Item |