Link to the University of Pittsburgh
Link to the University Library SystemContact us link
AEI Banner

COMMISSION STAFF WORKING DOCUMENT The planning methodology for the trans-European transport network (TEN-T) Accompanying the document Communication from the Commission Building the Transport Core Network: Core Network Corridors and Connecting Europe Facility {COM(2013) 940 final}. SWD(2013) 542 final, 7.1.2014

UNSPECIFIED (2014) COMMISSION STAFF WORKING DOCUMENT The planning methodology for the trans-European transport network (TEN-T) Accompanying the document Communication from the Commission Building the Transport Core Network: Core Network Corridors and Connecting Europe Facility {COM(2013) 940 final}. SWD(2013) 542 final, 7.1.2014. [EU Commission - COM Document]

[img] PDF - Published Version
Download (121Kb)
    Export/Citation:EndNote | BibTeX | Dublin Core | ASCII (Chicago style) | HTML Citation | OpenURL
    Social Networking:
    Item Type: EU Commission - COM Document
    Subjects for non-EU documents: UNSPECIFIED
    Subjects for EU documents: Regional & Structural Policy > Trans-European Networks (TENs)
    Transportation Policy > General
    EU Series and Periodicals: UNSPECIFIED
    EU Annual Reports: REGIONAL POLICY:Trans-European Networks
    Institutional Author: European Union, November 1993 to date > Commission
    Depositing User: Phil Wilkin
    Official EU Document: Yes
    Language: English
    Date Deposited: 21 Feb 2019 10:29
    Number of Pages: 8
    Last Modified: 21 Feb 2019 10:29
    URI: http://aei.pitt.edu/id/eprint/96114

    Actions (login required)

    View Item

    Document Downloads